Heavy weight, Dongfang Electric "New" won a big order!

Heavy weight, Dongfang Electric "New" won a big order!
  • 9th October 2023
  • admin

Recently, Dongfang Electric Wind Power Co., Ltd. won the bid for the 400 MW wind power project of 40 wells in Mulei, middling coal.

This project is the first cooperation between Dongfang Electric and middling coal Group in the field of new energy, and a strong support for the two sides to jointly implement the "double carbon" strategy. The project is located in Mori Kazakh Autonomous County, Changji Hui Autonomous Prefecture, Xinjiang, and plans to install 80 sets of 5 MW grade doubly fed wind turbines independently developed by Dongfang Wind Power.

 

Dongfang Electric 5MW grade doubly fed wind turbine adopts platform based and modular design, and applies the company's mature control strategy, electrical system, yaw system, tower, rack and other structures and technologies to configure wind turbine diameters of 183m, 195m and other specifications according to the actual situation of the wind farm. The unit also meets the demand for onshore single blade lifting, which can save 20% -40% of the lifting area and significantly reduce land acquisition and leveling costs. Breaking the limitations of complex terrain, lifting operations can be completed in areas where trees are dense, mountains are obstructed, and wind turbines cannot be assembled on the ground.

In recent years, Dongfang Wind Power has deeply implemented the leading strategy of the Group and made bold innovations. It has made great breakthroughs in the application of new materials, localization substitution, intelligent load shedding technology, lightweight tower design, and Artificial Intelligence for IT Operations. The research and development of 5MW grade doubly fed wind turbine units has applied a number of innovative technologies, and the overall technology of the unit has reached the industry-leading level.

 

 

Based on the advantages of good power generation performance, high economy and so on, Dongfang Electric's 5MW grade doubly fed wind turbine has been favored by users since it was put on the market last year. Up to now, more than 4000MW has been ordered in Shandong, Sichuan, Inner Mongolia, Hunan, Xinjiang, Liaoning, Chongqing and other provinces and cities.

The 40 Jingzi 400 MW wind power project in Mulei, middling coal is one of the coal power flexibility transformation projects in Xinjiang Autonomous Region. The marketing team of Dongfang Wind Power has optimized the scheme for many times according to the on-site wind resources, and finally won the recognition of users with the customized comprehensive scheme with the best power generation and economy of the project.

The winning of the 400 MW wind power project of 40 wells in Mulei, middling coal has further expanded the company's "circle of friends". In 2022, Dongfang Wind Power established a wind turbine main engine and blade manufacturing base with an annual output of 2 million kilowatts in Xinjiang at the "Dongfang New Speed" of "signing the contract that year, starting construction that year, building that year, and achieving results that year", which will help accelerate the establishment of a modern industrial system supporting high-quality development in Xinjiang. The winning of this project is of great significance for the company to continuously consolidate and expand the market in Xinjiang region, and promote the healthy development of the industry.